|
| |
GALLERY PORTFOLIO |
|
|
|
|
| |
 |
VUE Condominium (2005) - 36 story condo, Miami FL,; Tower illuminated with clear and blue color metal halide; Deco Façade illuminated with blue metal halide, white & filtered linear fluorescent and Halogen down-lighting.
Project cost $235,000; contract with owner |
|
|
|
|
| |
 |
Colpatria Tower (1999) - 48 story office tower, Santa Fe de Bogota Colombia 36
color changing xenon fixtures, Project $760,000 , contract w/ owner
WINNER: 1999 IESNA Int’l, "Paul Waterbury" "AWARD OF EXCELLENCE" |
| |

|
Wells Fargo Tower (2001) - 730’ tall office tower, Denver Co, successful test lighting With xenon,
Project estimate $850,000, contract w/ RNL Arch. |
| |

|
New World Tower (1996) - 30 story tower, Miami Florida, Using 6 metal halides & fluorescent,
Project cost $18,000 contract w/ owner |
| |

|
Banco Popular (1998) - 22 story office tower, San Juan, P.R. using 84 metal halide fixtures,
Project cost $62,000, contract w/ owner |
| |

|
Hato Rey Tower (1998) - 20 story office tower, San Juan, P.R., using 48 metal halide fixtures,
Project cost $42,000, contract w/ owner |
| |

|
Codina Headquarters Bldg (2001) - Coral Gables FL, 14 story office bldg, crown lighting using metal
halide, Project cost: $28,000; contract w/ Rodriguez & Quiroga Arch. |
| |

|
1428 Brickell Ave (1997) - 8 story office building, Miami, Florida, adding color filter system and lighting control, Project cost $6,500, contract w/ owner
|
| |

|
Gables Corp. Center (1998) - 13 story office building, Coral Gables Florida using 52 metal halide
fixtures, Project cost $65,000, contract w/ owner |
|
|
|
|
| |

|
Biscayne Bay Sheraton (1998) - 22 story hotel tower, Miami Florida, metal halide lighting of tower w/
optional color filters and tree lighting, Project cost $36,000,
contract w/ owner |
| |

|
JW Marriott (2001) - 20 story hotel tower, metal lighting, Project cost $18,000, contract w/ Nichols, Brosch & Sandoval Arch |
| |

|
Golden Moon Hotel/Casino (2001) - 20 story hotel & casino, Philadelphia MS, many types of lighting,
animated show lighting w/ ETC controllers, Project cost $800,000, contract w/
Arquitectonica Miami
WINNER: 2002 GE EDISON AWARD, 2002 GE EDISON "AWARD OF EXCELLENCE"
WINNER: 2003 IESNA Int’l "Paul Waterbury Int'l " "AWARD OF EXCELLENCE"
WINNER: 2003 IESNA Int'l "AWARD OF MERIT" |
| |

|
Atlantic Hotel (2002) -19 story hotel, Ft. Lauderdale Beach, Florida, HPS MH & CFL lighting
Project cost $68,000, contract w/ Garcia & Ferraro Arch. |
| |

|
Villa Regina Condo (1997) - 27 story condo, using metal halide 12 uplights,
Project cost $10,500
Contract w/ condo assoc |
| |
 |
Il Villaggio Condo (2004) -Miami Beach,FL; 17 story condo using color changing MH, HPS, MH & CFL Project cost $30,000; contract w/ condo assoc
|
| |
 |
Punta Cana Resort Hotel-Punta Cana, Dominican Republic; lighting hotel entrance, lobby using CFL &
Incand, Project Cost: $80,000, contract w/ owner |
|
|
|
CLASSIC BUILDINGS & CHURCHES  |
| |
 |
Georgia St. Capital (1996) - Atlanta GA, 108 year old historic capital, Olympic lighting
using HPS & MHProject cost: $32,000; contract w/ owner;
WINNER: 1999 IESNA Int'l “Award of Merit” |
| |
 |
Texas State Capital (2001) - Austin TX, 102 year old capital, redesigned new lighting system using MH
in-grounds, pole lights & roof lights, not installed, estimated cost $95,000,
contract w/ Ford, Powell & Carson Arch |
| |

|
National Sanctuary Church of Panama (1999) - Panama City, Panama; Italian style façade illuminated
perfectly with Halogen, Project cost $8,000; contract w/ Lamparas Varibe;
WINNER: 2000 GE Edison “Award of Excellence”
WINNER: 2000 IESNA Int'l “Award of Excellence” |
| |
 |
Bascillica Don Bosco (2004) - Panama City, Panama; 70 year old main Bascillica using deluxe HPS
exterior, Halogen interior, Project cost $16,000; contract w/ Lamparas Varibe |
|
|
|
|
| |

|
MacArthur Causeway Bridge (1999) - Miami, Florida; 1700’ concrete tee dual bridge w/ colored filtered
Metal halide & fluorescent fixtures, Project cost: $2.4 million, contract w/ engineer;
WINNER: 1999 GE Edison “Award of Excellence”
WINNER: 2000 IESNA Int'l “Award of Merit” |
| |
 |
Bridge of the Americas (2003) - Panama Canal, Panama; 4200’ lighting of steel box & arch truss bridge
using 378 filtered metal halide fixtures, Project cost: $780,000, contract w/ Conceptos Briliante;
WINNER: 2003 GE Edison “Award of Merit”
WINNER: 2004 IESNA Int'l “Award of Merit” |
| |

|
Dodge Port Bridge (1996) - Miami, Florida; 1200’ concrete tee bridge w/ colored lamp metal halide
Project cost: $1.2 million, contract w/ engineer |
| |

|
Main Street Bridge (2000) - Green Bay, WI, 1600’ steel dual bascule arm bridge using filtered metal
halide & incand.fixtures, Project Cost: $185,000, contract w/ City of Green Bay |
| |
 |
Mason Street Bridge (2000) - Green Bay, WI, 2600’ concrete bridge using filtered metal halide & incand. Fixtures, Project cost: $240,000; contract w/ City of Green Bay |
| |
 |
Walnut Street Bridge (2000) - Green Bay, WI, 1250’ steel dual bascule arm bridge using filtered metal
halide & incand. Fixtures, Project Cost: $160,000, contract w/ City of Green Bay |
| |
 |
Brickell Key Bridge (1997 & 2000) - Miami, FL, 900’ concrete bridge using metal halide & CFL fixtures
Project cost: $52,000, contract w/ owner |
| |
 |
Lane Avenue Bridge (2002) - Columbus, OH; 330’ concrete cable stay bridge using metal halides,
Project cost: $146,000; contract w/ bridge engineer |
| |
 |
Ringling Causeway Bridge (2002) - Sarasota, FL; 3200’ concrete box beam bridge using MH fixtures
Project cost: $240,000; contract w/ bridge engineer
|
|
|
|
MONUMENTS & OTHER STRUCTURES         |
| |
 |
Borabudor Buddhist Temple(2003)- Yogykarta, Indonesia; 1200 year old carved stone, World’s largest
Buddhist Temple, using 8 pole mounted CMH & 4 pole mounted MH fixtures,
Project Cost: $62,000, contract w/ GE |
| |
 |
Monument of Restoracion (2003) - Santiago, Dominican Republic, 7 levels of color changing metal
halide fixtures & 1 xenon into sky, project cost $140,000; contract w/ Centrolux Lighting
|
| |
 |
Monument of Flags (1998) - Santa Fe de Bogota Colombia, metal halide & CFL of 16 statue/flagpoles
Project cost $12,000; contract w/ the City of Bogota |
| |
 |
Merrick Park (1997) - Coral Gables FL, illumination of monument, arbor & fountain using incand
halogen. Project cost $3,000; contract w/ Optimist Club |
| |
 |
Punta Cana Airport New Terminal (2004) - Punta Cana, Dominican Republic; metal halide down-lighting, HPS ceiling up-lighting, linear fluorescent and CFL illumination of stores and restaurants; Project Cost = $92,400, contract w/ owner |
| |
 |
Punta Cana Airport Existing Terminal (2004) – Punta Cana, Domincan Republic; energy efficiency retrofit of existing MH & fluorescent fixtures, addition of new MH & HPS to increase light levels; Project Cost = $78,800, contract w/ owner |
| |
 |
Top Thrill Dragster (2003) - Sandusky OH, world’s faster roller coaster with 420’ high tower, lighting
tower & loading platform using metal halide & CFL, Project Cost: $87,000, contract w/
owner;
WINNER: 2004 IESNA Int’l “Award of Merit” |
| |
 |
Whale Wall-Atlanta (1996) - Atlanta GA, 220’x60’ high wall mural illumination with metal halide
Fixtures Olympic lighting, Project cost $12,000, contract w/State of Georgia |
|
|
|
|
| |
 |
Bayfront Park (2004) - Miami FL, 36 acre multi-use park using metal halide & CFL
Project Cost: $320,000; contract w/ City of Miami |
| |
 |
Burak Residence (2002) - Coconut Grove FL, landscape with incand & metal halide,
Project cost: $7,500
COVER “& ARTICLE: Landscape Architect Magazine Mag. April 2002
|
| |
 |
Chaumburger Residence (2002) - Coral Gables FL, illumination with low voltage halogen,
Project cost:$9,000; contract w/ owner |
| |
 |
Nature Villas Punta Cana Resort (2003) - Punta Cana Dominican Republic, 29 Villas landscape lighted,
walkways lit, pool & park facilty, Project Cost $142,000; contract w/ owner |
| |
 |
Burger King Headquarters Entrance (1998) - Coral Ridge FL, lighting of 26 palm trees with MV lamps,
Project Cost: $10,500, contract w/ owner |
| |
 |
Centro Sambil Galleria Cascades (2001) - Caracas Venezuela, low voltage halogen lighting of
commercial cascades, 45’ high x 110’ wide; Project cost: $5,200; contract w/ Proyectos Tuy |
| |
 |
Punta Cana Hotel (2004) - Punta Cana Dominican Republic, fountain/garden at hotel entrance,
Project cost: $9,400; contract w/owner |
|
|
|
|
|
 |
Centro Sambil Galleria Cascades (2001) - Caracas Venezuela, low voltage halogen lighting of
commercial cascades, 45’ high x 110’ wide,
Project cost: $5,200; contract w/ Proyectos Tuy |
| |
 |
Punta Cana Hotel (2004) - Punta Cana Dominican Republic, fountain/garden at hotel entrance,
Project cost: $9,400; contract w/owner |
|
|
|
|
| |
 |
St. Thomas University (1994) - No. Miami, Florida, developed security lighting around buildings to prevent robbery using MH & fluorescent, Project cost $38,000, contract w/ owner |
|
 |
Hillsboro Center (1997) - Deerfield Beach, Florida; security lighting around buildings to prevent robbery
using HPS, Project cost $22,000, contract w/ owner |
|
 |
Centro Sambil Galleria (2001) - Caracas Venezuela, Metal Halide Safety & facade lighting on 6 story
galleria walls & entrance walks, Project cost: $27,000, contract/w Proyectos Tuy Ltg |
|
|
|
|
| |
 |
Crown Casino Continental Riande Hotel (2004) - Panama City,Panama; casino lighting with color
changing LEDs, neon & halogen lighting, Project Cost: $140,000, contract w/ owner |
| |
 |
Metro Mall (1994) - Miami, Florida; energy efficient retrofit of 8 story office building with retail on first 3
Floors, Project Cost: $65,000, contract w/ owner |
| |
 |
Wolf Hair Salon (1995) - So. Miami, Florida; created 6 custom fluorescent lighting systems to match
Interiors of workstations, Project cost: $3,400, contract w/ owner |
| |
 |
Midori Art Gallery (2000) - Coconut Grove, Florida, created lighting for 3 separate galleries with
adjustable halogen lighting with glare control, project cost $38,000, contract w/ owner |
| |
 |
Southeastern Foods (1995) - No. Miami, Florida; energy efficient retrofit of office & warehouse,Project
cost: $28,000, contract w/owner;
WINNER: 1996 IESNA Int’l “Award of Merit” |
| |
 |
Punta Cana Airport (2004) - Punta Cana, Dominican Republic, new terminal & retrofit of exist. terminal
using MH, HPS & fluorescent, Project cost $187,000, contract w/ owner |
| |
|
|
|
 |
|